Cable trays on the BIM model
Tray nodes and runs drawn directly on the 3D structure.

Today. Every changed value means hours redoing calculations and reissuing documents.
With EPIC. Change a value and EPIC recalculates and reissues everything that depends on it. Progress, revisions and client approval, on the same model.
Cable sizing · W-101
Rev. C issuedExample calculation.
Tray nodes and runs drawn directly on the 3D structure.
Cross-section by thermal, voltage-drop and short-circuit criteria, with installation parameters in view.

Nodes and channels placed on plan, elevation and side-view drawings.

Gantt of the document list with planned, actual and pending issues.

Whatever depends on it: cables, short circuit, sizing, lists and reports. Before approving the change you see what it affects.
It reads datasheets, drawings and lists in PDF, IFC, DXF and Excel, and routes trays and cables on the BIM model or on the drawings.
They come in with their own role. Suppliers provide their data and receive only what is theirs; the client reviews and approves. Clarifications (RFI and RFC) are traced.
EPIC is launching soon, and we’re opening a limited number of places in the pilot programme for manufacturers and integrators, engineering firms and utilities, at a reduced cost. Pilot members use EPIC on their own projects, with the EPIC team alongside them to get it running.